Saturday 15 February 2014

Frames day 3

There was not a lot of noticeable change today. They finished off 'almost' all of the framing but there is a few small bits left. The main bit that I noticed completed, was the roof area over the patio. It kind of makes the facade take on a bit more shape.

Patio area completed
OK, so we were excited to get the dunny as it meant that the build was starting, but now, not so sure. It is in every picture of the front! Wish they would move it :)

The conduit for the electricity has also been buried.

I received a call from the site supervisor yesterday. This was our first contact with him. He introduced himself and gave me an update. I don't think he realizes I am only 5 minutes down the road and obsessively drive past the block numerous times per day. Anyway, he said the frames should be completed by Monday and he hopes to have the bricks and brickies on site by the end of the week. If not, the Monday after the weekend(24th Feb?).

On the weather front, it is drizzling outside now. Certainly not building weather. So Mother nature, lets get this rain out of the way before the working week recommences :)