Thursday 6 February 2014

Formwork day 2

I received a call from our slab supervisor today to let me know they used 27metres for piering. We had an allowance of 50 metres, so looks like we have a bit of a refund heading our way.We will need it! There is a couple of hurdles further down the track.

Two that I am thinking about right now:

  • Driveway position is right where there is a stormwater drain. Driveway either needs to be changed, or the drain cut out and a grate put in.
  • Possible steps required for the front patio - depending on how we landscape here..
During the call, Matt(slab supervisor) also said that they hope to finish the formwork today, and if they did, they are planning to pour the slab tomorrow! After a quick visit to the site this afternoon, it looks like we are ready to go. Here are the latest pics

View of the front from the right hand side

View across from the right hand side

View from right hand side towards the back

View from the rear right hand cornore looking back towards the front left

Similar to the above.

View from rear right, across the back with the alfresco in the rear of the photo

Front to back

Hrmm.. look at the drop edge for the patio. Not sure at this stage how we will landscape this.. Probably a LOT of fill.

I thought there would be enough clearance to store the boat(tinnie) up the side. Now, not so sure..Might just manage to get it up wedged in between the fence and the water tank. The protruding formwork is for the water tank

Bit of glare in this one, but this is looking at the drop edge from the main house to the garage. (686mm drop)

And another from directly in front.
 So hopefully tomorrow, we will have a slab! Stay tuned for updates