Saturday 7 March 2015

Stacking Blocks Day 2

Stacked all of the blocks for the rear wall and started the backfill/corefill. Still a way to go though..

Left corner. Transitions from 600mm to 400mm



Need to cut some blocks in half, so the ends are not yet finished. Unfortunately I don't have a masonry saw

No fines concrete backfill. A bit of overkill on a 600mm wall, but I'd rather 'over engineer' than have it fall down. 